G. W. Graham Secondary School Addition
Provided Services: Building Envelope
Client: School District 33 Chilliwack
Architect: studioHuB architects
Location: Chilliwack, BC
*Photo credit: Kristen McGauhey Photography
Completed in 2023, the addition consists of two buildings: a two-storey academic wing and an industrial education and robotics building. The buildings are connected through a covered outdoor learning area. Mass timber components, including extensive dowel laminated timber canopies, are featured at many locations giving a warm feel to the school and much welcomed protection from the rain.